The installations must allow the production of a compost that meets at least the Nfu 44-051 standard of industrial energy wood. The planned site of implantation (2.6 ha) is subject to proven sensitivities, in particular environmental sensitivities and sensitivities to flood risks. Projects should be conducted to respond effectively to these sensitivities. The integration of the project into its environment will be a major issue in the design phase. Projects must be part of a High Environmental Quality (BDM or equivalent) approach and must take into account the objective of optimizing and rationalizing energy, including the use of locally produced renewable energy. Regulatory studies (clearing, request for exemptions for protected species, ICPE files) are not the responsibility of the successful candidate. The deposit of the building permit will be the responsibility of the successful candidate.
The installations must allow the production of a compost that meets at least the Nfu 44-051 standard of industrial energy wood. The planned site of implantation (2.6 ha) is subject to proven sensitivities, in particular environmental sensitivities and sensitivities to flood risks. Projects should be conducted to respond effectively to these sensitivities. The integration of the project into its environment will be a major issue in the design phase. Projects must be part of a High Environmental Quality (BDM or equivalent) approach and must take into account the objective of optimizing and rationalizing energy, including the use of locally produced renewable energy. Regulatory studies (clearing, request for exemptions for protected species, ICPE files) are not the responsibility of the successful candidate. The deposit of the building permit will be the responsibility of the successful candidate.