Drinking-water treatment plant construction work | Tenderlake

Drinking-water treatment plant construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
22 September 2023
Closing Date:
20 October 2023
Location(s):
FRY50 Mayotte (FR FRANCE)
Description:
global performance contract for the design, construction and operation of the future Grande Terre desalination plant in Ironi Bé

This consultation concerns the design, execution of the works and operation of the future drinking water treatment plant by desalination of Grande Terre located in Ironi Bé, with a capacity of 10,000 m3/day

The contract includes: - design studies (project)- execution studies, - building permit, - carrying out the works, - commissioning, operation for 3 years (renewable 2 times per 1 year). The seawater intake, the construction of the plant platform and the brine discharge pipes are not part of this overall performance contract (subject of another contract). The distribution of services between these 2 contracts is presented in the annex to this CR in the document "Program-V2"

Download full details as .pdf
The Buyer:
les Eaux de Mayotte
CPV Code(s):
45252126 - Drinking-water treatment plant construction work