The construction case deals with 122 homes spread over two blocks located on the Dat Schaub site, Storegade 88, Esbjerg. The blocks are of varying heights with 4 and 5 floors respectively. In one block is established community house on the ground floor. The blocks are traditionally built up with rear wall elements that are shell-walled. However sandwich elements are used at dovetaways. Floor decks are concrete elements. Windows are wood/alu. Roof is “flat” completed with cardboard. Heating is done via district heating (underfloor heating). Ventilation is done via decental plants. Total gross floor area is 10,600 m².
Soil, sewer and coating. Incl. soil handling and soil deposition.Land, sewer and paving works related to the establishment of 122 homes.
Roofing workerDelivery of roofing works in connection with the establishment of 122 homes.
paint WorksDelivery of painting works as part of the establishment of 122 homes.
LiftProvision of elevators in the establishment of 122 homes.
Floor build-up (EPS concrete + wear layer)Delivery of Floor construction (EPS concrete + wear layer) in the establishment of 122 homes.
Fixtures incl. assemblyDelivery of Fixtures incl. installation of 122 dwellings.
Concrete worksConcrete works associated with the establishment of 122 housing units.
Concrete elementsDelivery and installation of concrete elements associated with the establishment of 122 residential buildings.
Bath cabin deliveryDelivery of bath cabins in conjunction with 122 homes.
SteelDelivery of Steel in the establishment of 122 homes.
Plumbing worksPlumbing works related to the establishment of 122 housing units.
Power WorkerDelivery of electric works with the establishment of 122 homes.
Ventilation worksDelivery of ventilation works in the establishment of 122 homes.
BricklayersDelivery of Mason works in the establishment of 122 homes.