Framework agreement to purchase orders relating to routine maintenance and development work for the needs of University sites. The expected services are described in the CCAP and the CCTP. The contract takes effect from its date of notification for a period of one year expressly renewable three times, without being able to exceed a period of four years.
Demolition - VRD - scaffolding - structural work - hard floor coveringExecution studies, demolition, VRD, EU / EP evacuation under paving, masonry, scaffolding, stone paving, sealed tiles, wall tiles, sealed signs on the ground (tactile passages, etc.).
Framework - roofing - waterproofingExecution studies, frame, waterproofing, cover of all kinds, zinc works / EP, smokehouse.
Exterior joinery - locksmith - metalworkExecution studies, exterior wood / metal / PVC joinery, locksmith / exterior metalwork.
Lining - partitions - false ceiling - interior joinery - interior fittingsExecution studies, dubbing, partitions, plastering-insulation, false ceilings, interior joinery, interior carpentry, scaffolding, acoustic treatment, window decoration, interior hardware / metalwork and wall signage.
Electricity CFO - CFAExecution studies, strong currents, weak currents, optical fiber, electric heating, fire / intrusion alarms, magnetic hearing loops.
HVAC - plumbing - sanitary equipmentExecution studies, plumbing, sanitary, heating, air conditioning, domestic hot water, ventilation - air treatment.
Painting - flexible floorsPaint, wall coverings, flexible floor coverings, PRM signs integrated into flexible floors.
CleaningCleaning and maintenance.