The Bellenkopf / Rappenwört polder (BeRa) is part of the Integrated Rhine Program (IRP) in the Karlsruhe district. The retention area (RHR) will have a retention volume of approx. 14 million m
The plan approval decision has been available since December 2020. In 2021, the planning services for the structural implementation will be awarded and the implementation planning will begin. The completion target of the structural implementation is 2028.
Further details on the project can be found in the tender documents on the award platform (documents number group 500). A brief description of the pursued lot formation can be found in document 510.
With this contract announcement, the awarding of freelance services for the following (planner) lot is pursued:
Pl2-1 no planner: inlet and outlet structures.
II.2.4.1) Sub-area to be processed with the contract to be awarded:
The services to be awarded for planner lot PL2-1 relate to the measures of lot 2. The following can be named as essential objects:
- BL2-1: Building 1 (5-speed),
- BL2-2: Building 2 (1-way),
- BL2-3: Building 3 (2-way),
- BL2-4: building 4 (4-speed),
- BL2-5: Building 5 (2-way).
A detailed overview of the measures / objects to be processed can be found in document 510 (list of measures) of the procurement documents on the procurement platform.
II.2.4.2) Performance profile:
The planning lot PL2-1 essentially includes the following services to be provided for the aforementioned objects:
1. Project planning engineering structures according to § 43 HOAI, partial services LP 2 and 3, LP 5-9 complete;
2. Local construction supervision in accordance with Annex 12.1 HOAI;
3. Technical planning of technical equipment according to § 55 HOAI, LP 1-9 without 4;
4. Construction survey according to Annex 1.4.7 HOAI, LP 1-5 without 4.
Further details can be found in the description of services (document 302 of the tender documents on the tender platform).
II.2.4.3) Step-by-step commissioning:
The assignment takes place in stages:
Stage I = basic contract: services up to the preparation of the tender documents (service phase 6);
Stage II = optional services: Services of the construction phase (from service phase 7).