The client intends to renovate the Steinbach dam in Kempfeld-Katzenloch. The subject of the services to be provided is the manufacture and installation of a removable pedestrian bridge as a connection of the two semi-works of the dam crown of the flood relief system to be renewed (the renewal of the HWE is not part of the service to be provided). Due to the load conditions on site, it is not possible to lift the footbridge as a whole; it must be assembled on site.
The client intends to renovate the Steinbach dam in Kempfeld-Katzenloch. The subject of the services to be provided is the manufacture and installation of a removable pedestrian bridge as a connection of the two semi-works of the dam crown of the flood relief system to be renewed (the renewal of the HWE is not part of the service to be provided). Due to the load conditions on site, it is not possible to lift the footbridge as a whole; it must be assembled on site.