Bauhaus - Weimar University, location development Coudraystraße 7-13,
Modernisation of the faculty building at Coudraystraße 7
Trockenbauarbeiten:
- 9,2 m² Montagewand, CW75/125; GKB
- 80 m² Montagewand, CW75/132,5; GKFI, F30, 57dB
- 20 m² Montagewand, CW75/135; GKFI, F30, 57dB
- 141 m² Montagewand, CW75/125; GKFI, F30, 61dB
- 264 m² Montagewand, CW75/125; GKBI
- 827 m² Montagewand, CW50/100; GKB, F30
- 635 m² Montagewand, CW50/100; GKB
- 180 m² Montagewand, CW75/125; GKFI, 61dB
- 46 m² Installationswand, CW50/350; GKBI
- 158 m² Installationswand, CW50/450; GKFI, 57dB
- 66 m² Installationswand, CW50/470; GKB, F30, 57dB
- 94 m² Installationswand, CW50/750; GKBI
- 121 m² Vorsatzschale, CW75; GKBI; < 4.00 m
- 16 m² vorsatzschale, CW75; GKBI; < 5.00 m
- 36 m² Vorsatzschale, CW100; GKB
- 202 m² Vorsatzschale, CW50; GKB
- 83 m² suitcase, L-shaped; CW75/87.5; CementBoard
- 137 m² Vorsatzschale, CW50; GKFI
- 20 m² Vorsatzschale, CW50; GKF, F30
- 762 m² Vorsatzschale / Brüstungsverkleidung, CW75; GKB
- 153 m² shaft walls with doors, F90-A; Silicate fire protection building board
- 97 m² acoustic cladding, CW75/145; GKFI
- 41 pcs inspection flaps wall, different sizes
- 3 pcs inspection flap wall, different sizes, F30
- 14 pcs fire protection clothing steel support, three-sided, F90
- 36 m fire protection cladding steel beam, three-sided, F90
- 274 pcs. Fire protection cladding wooden support, two-sided, F30-B
- 5 WC cubicle, 1 compartment incl. door, 840/1,250/2,450 mm
- 6 WC cubicle, 2-fold incl. doors, 1,680/1,250/ up to 2,590 mm
- 1 WC cubicle, 4 compartments incl. doors, 3,770/1,250/2,590 mm
- 899 m² GK ceiling, suspended, smooth, AHH 135 mm
- 2.1 m² GK ceiling, suspended, smooth, AHH 885 mm
- 1163 m² Akustikdecke UFF, GK-Lochdecke, AHH 135 mm
- 146 m² Akustikdecke UFF, GK-Lochdecke, AHH 385 mm
- 47 m² cantilevered ceiling, GKB, CW/UW 75, AHH 385 mm
- 146 m² cantilevered ceiling, GKB, CW/UW 75, AHH up to 751 mm
- 175 m² cantilevered ceiling, GKB, CW/UW 50, AHH up to 495 mm
- 78 m² cantilevered ceiling, F30, GKF, CW/UW 75, AHH 735 mm
- 25 pcs inspection flaps ceiling, different sizes
- 5 pcs inspection flaps ceiling, 400x400 mm, F30
- 2,146 m² anchoring in prestressed concrete hollow chamber slabs