Track replacement at Lutherplatz (approx. masses):
500 m² removal and installation of track pavement with paving compound
500 m² removal and installation levelling layer on existing bituminous base course
Make 1 piece of double-track branch, consisting of switches 865 and 866 with track crossings, thick-web rails, arch and sidings (a total of approx. 180 m of grooved track)
19 m Kasseler Sonderborde herstellen
Making 8 m of Kassel crossing boards
Track replacement at Lutherplatz (approx. masses):
500 m² removal and installation of track pavement with paving compound
500 m² removal and installation levelling layer on existing bituminous base course
Make 1 piece of double-track branch, consisting of switches 865 and 866 with track crossings, thick-web rails, arch and sidings (a total of approx. 180 m of grooved track)
19 m Kasseler Sonderborde herstellen
Making 8 m of Kassel crossing boards