Electrical wiring and fitting work | Tenderlake

Electrical wiring and fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
17 January 2022
Closing Date:
16 February 2022
Location(s):
DE404 Potsdam, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
VE 34.1 - High voltage, preparatory measures 2nd BA level 0 - City Hall Potsdam

For the preparation of the complete renovation of a

Building sections will be constructed on the ground floor of this area

measures carried out.

Over a length of approx. 100 m, the ground floor of the building will

Open the floorboard and remove the plaster from the walls.

The cables running in the floor and in the walls must be

de-energized and disassembled.

The riser point distributors, which also cover the levels above

are provisionally fed in.

Emergency lighting circuits in the EC of the

Construction phases are activated and the luminaires

dismantled.

The installation on an area NGF of 1100 m² will be completed

removed.

In a room structurally prepared for installation, the

Building main distribution built in.

The switchgear is mounted on a 47cm angle profile frame

installed upright in an electric raised floor.

The installation takes place below this recordable

raised floor. All incoming and outgoing cables are stored in

Usually fed from below.

The GHV is assembled completely ready for use.

In the adjacent room, the currently used

For the preparation of the complete renovation of a

Building sections will be constructed on the ground floor of this area

measures carried out.

Over a length of approx. 100 m, the ground floor of the building will

Open the floorboard and remove the plaster from the walls.

The cables running in the floor and in the walls must be

de-energized and disassembled.

The riser point distributors, which also cover the levels above

are provisionally fed in.

Emergency lighting circuits in the EC of the

Construction phases are activated and the luminaires

dismantled.

The installation on an area NGF of 1100 m² will be completed

removed.

In a room structurally prepared for installation, the

Building main distribution built in.

The switchgear is mounted on a 47cm angle profile frame

installed upright in an electric raised floor.

The installation takes place below this recordable

raised floor. All incoming and outgoing cables are stored in

Usually fed from below.

The GHV is assembled completely ready for use.

In the adjacent room, the currently used

Download full details as .pdf
The Buyer:
KIS - Kommunaler Immobilien Service, Eigenbetrieb der Landeshauptstadt Potsdam
CPV Code(s):
45311000 - Electrical wiring and fitting work