Planning of a new fire station in the municipal area:
3 parking spaces truck 13 m, heated min. 12°C, clear height 5 m
1 changing room and sanitary facilities for 34 men incl. black/white separation
1 changing room and sanitary facilities for 8 ladies incl. black/white separation
1 youth changing room for 20 teenagers with a locker
1 room laundry logistics (washing machine/dryer/external service provider)
1 consultation room grey area for approx. 14 people with washbasin, office corner and
in spatial relation to laundry logistics / boot washing and kitchenettes /
storeroom
1 training room for approx. 50 people in relation to the tea kitchen /
storeroom
1 kitchenette / storage room adjacent to the training room (serving hatch) with
natural light and ground-level outdoor access
1 local military commander's office with 3 workstations and consultation table for 4 persons
1 multipurpose room for 10 people
1 storage room fire brigade incl. small workshop
1 storage room / logistics area with ground-level external access (pallet truck), load width
1.2 m + 2 x traffic area 0.5 m for 10 pallet storage footprints
1 house connection room incl. emergency power concept
1 Putzmittelraum
18 parking spaces for cars
Attention to the disengagement area and road integration, alarm routes, delivery and disposal routes.
Compliance with the valid Brandenburg building code, DIN 14092 (fire stations) and DGUV 205-008 (safety in the fire station)
- Object planning according to HOAI
- Structural design according to HOAI
- Outdoor facility planning according to HOAI