facade
The Landschaftsverband Rheinland is carrying out a renovation and conversion of the educational area Luise-Leven-Schule Krefeld, Lobbericher Str. 18-20, 47839 Krefeld. It is a school with a focus on hearing and communication.
The area is divided into the following 4 buildings:
School building, daycare center, indoor swimming pool and playground toilet. Part of the measure are the school building and the daycare center. In addition, there is the execution of a 2-storey interim solution for the relocation of the school building and the daycare centre, which is to be placed on the football field and kept for the entire construction period.
The buildings were erected in the 1980s and have a ribbon-like façade structure of window levels and slate in the parapet area. The slate has been deteriorated for years and is now to be replaced by façade elements made of fibre cement in the course of the energy-efficient renovation. The windows and doors will also be replaced. The renovation of the façade affects the school building and the daycare center.
The following measures are also carried out:
The scope of the renovation includes the following contents and results from the
Implementation of a new barrier-free concept and the renovation of the building services:
· Upgrading of structural fire protection
· Energy-efficient renovation of the façade
· Revision of steel-glass façade street side
· Replacement and renewal of all window systems and elements / exterior door systems
· Flat roof renewal green roof (daycare center, playground toilet)
· Kaltdacherneuerung Eingangsüberdachungen
· Renewal of room acoustics
· Renovation of the interiors
· Implementation of barrier-free concept
· Change of use of the caretaker's apartment (extension of the teachers' room)
· Renewal of the locking system
· Schadstoffsanierung
· Construction of a dining room KiTa (extension or extension)
· Demolition of the building services (ventilation system, air conditioning, sanitary facilities,
Electrical engineering, etc.)
· Complete renovation of the building services
· Sanitary engineering: Renewal of installations and pipes in sanitary areas
· Renewal of the ground pipes
· Renewal of drainage pipes
· Renewal of heating technology including heating pipes
· Renewal of communications technology
· Renewal of ventilation technology
· Renewal of the measurement and control technology (MSR) and
building automation
· Installation of fire alarm system (BMA) and voice alarm system (SAA)
· Lighting
· Installation of a photovoltaic system on the roofs of the school building and daycare center
· Partial replanning of the outdoor facilities (fire brigade access)
· Interim solution consisting of containers for temporary use as classrooms incl.
TGA planning
-Schadstoffsanierung
-Renewal of floors with screed
The two buildings will be renovated in a total of 3 construction phases from October 2023 to August 2026.
The property has an almost trapezoidal footprint. The property is accessed by Lobbericher Straße. The main entrance is on the
opposite side of the road. Parking spaces are available in the public traffic area
disposal.
The main access to the main entrance or schoolyard is also via the
Lobbericher Straße.
The school building has a gross floor area of 26,165.95 m³ and a gross floor area of 5,701.69 m²
The nursery has a BRI of 2,014 m³ and a gross floor area of 601 m²