Conversion of the building in 2001 in the old barracks into an 11-group daycare center.
In order to prepare the building for the use of a KiTa, extensive demolition measures and a large number of new construction measures are necessary.
Lot 26 - painting work.
- Primer wall/ceiling: 11,145 m²
- felt plaster: 4,198 sqm
- Paint fleece blankets: 906 sqm
- Paint fleece walls: 2,843 sqm
- silicate paint wall/ceiling: 10,740 sqm
- Varnishing steel frames: 184 pcs
- concrete wall paint, outside: 143 sqm