structural work
Reconstruction and expansion of a primary school in 2 construction phases in the period September 2023 to July 2026.
2-storey extension with:
- 360 m² KS Masonry 24 cm
- 185 m² KS Masonry 17.5 cm
- 160 m³ in-situ concrete foundations
- 262 m³ in-situ concrete floor, ceiling slabs, columns and walls
Existing building
- Dismantling and demolition work
- Create door openings, close wall openings
- wall and ceiling openings