Design in the West Tallinn area. The volume of the public procurement includes the design of a 0.22-20 kV power grid, simpler works on the power network up to 35 kV, a multitube system for a communication facility, a street lighting network and charging infrastructure for electric cars. The design of a multi-pipe system and a street lighting network for a communication facility is generally ordered by the contracting authority if it is designed largely on the same route as the projected power network or is located in the same project area. The contracting authority does not order the design of communication cables or shields under the procurement contract.
Design in the West Tallinn area. The volume of the public procurement includes the design of a 0.22-20 kV power grid, simpler works on the power network up to 35 kV, a multitube system for a communication facility, a street lighting network and charging infrastructure for electric cars. The design of a multi-pipe system and a street lighting network for a communication facility is generally ordered by the contracting authority if it is designed largely on the same route as the projected power network or is located in the same project area. The contracting authority does not order the design of communication cables or shields under the procurement contract.