The supply consists of the design, construction, supply, transportation, assembly, testing and commissioning of:
— 2 (two) cable lines AT and their accessories necessary for the inand-exit connection of the hospital CP.
The supply is meant in a single batch and as described in detail in the documents “ATCPFO_02_Technical specification cable AT and their accessories” and “ATCPFO_03_Technical specification of works”.
The supply consists of the design, construction, supply, transportation, assembly, testing and commissioning of:
— 2 (two) cable lines AT and their accessories necessary for the inand-exit connection of the hospital CP.
The supply is meant in a single batch and as described in detail in the documents “ATCPFO_02_Technical specification cable AT and their accessories” and “ATCPFO_03_Technical specification of works”.