Material procurement of tracks and track constructions for track renewal measures in 2023 and 2024
HEAG mobilo GmbH intends to renew tracks and track constructions in the route network. The procurement of track materials for subsequent renewal measures are part of this invitation to tender and are taken up in the structure of the specifications as follows:
01 Track renewal between BÜ Im Schecken and Im Güldenen Wingert station in Seeheim
02 Renewal of the tracks in the area BÜ Malchen until track change 830/831
03 Renewal of the rails in the outer arch on Tannenbergstraße in Seeheim
04 Access to the single-track system in Griesheim Wagenhalle
05 Track renewal Griesheim Herweghstraße - Wilhelm-Leuschner-Straße
06 Renewal of the tracks in the area BÜ Kantstraße in Griesheim
07 Renewal section between Schloßstraße and Friedhof stop in Eberstadt
08 Renewal of the curves of line 4/5/6/7/8 at Luisenplatz
09 Lagermaterial
Delivery dates and dimensions:
The delivery of the above-mentioned track materials must take place in two separate periods:
The first delivery of the materials (sections 01 to 03 of the LV) must take place by 18.09.2023 at the latest.
The second delivery of the materials (04 to 09 of the LV) must be made by 04.03.2024 at the latest, but not before 08.01.2024.
Until the realization of the respective construction measures, the track material will be stored on the premises of the AG, Am Katzloch in 64589 Stockstadt am Rhein.
The following approx. masses result from the above-mentioned sub-measures:
Production and supply of tracks made of vignole rails with sleepers
- 655 m delivery 09.2023
- 70 m delivery 03.2024
Production and supply of track transition profiles 49 E 1 to 60 R2
- 4 pcs. delivery 09.2023
- 18 pcs delivery 03.2024
Production and supply of rut rails for rail profile 49 E 1
- 9 pcs. delivery 09.2023
- 36 pcs delivery 03.2024
Production and supply of tracks made of vignole rails without sleepers
- 445 m delivery 09.2023
Production and supply of tracks made of grooved rails without sleepers
- 13 m delivery 09.2023
- 460 m delivery 03.2024
Production and supply of track construction turnouts
- 1 delivery 03.2024
Production and supply of track construction crossing
- 1 delivery 03.2024
Production and supply of tracks made of grooved rails with sleepers
- 163 m delivery 03.2024
Production and supply of vignole rails
- 400 m delivery 03.2024