Development work in existing areas and new construction work for the realization of a building extension. The extension works require the complete demolition of an existing building. Provisional start of works in October 2020 for a period of twenty months.
Lot one: asbestos removalAsbestos removal.
Lot ten: furniture and equipmentFurniture equipment.
Lot eleven: false ceiling plastering insulationInsulation false ceilings plastering.
Lot twelve: earthenwareEarthenware.
Lot thirteen: flexible floor coveringsFlexible floor coverings.
Lot fourteen: paintingPainting.
Lot fifteen: HVAC sanitary plumbingHVAC sanitary plumbing.
Lot sixteen: SSI electricitySSI electricity.
Lot seventeen: elevatorElevator.
Lot eighteen: frame and facade sandwich panelsFrame and facade of sandwich panels.
Lot two: VRD - green spacesRoads and various networks - green spaces.
Lot three: demolitionsDemolitions.
Lot four: structural workBig work.
Lot five: roof structureRoof frame.
Lot six: sealingSealing.
Lot seven: exterior joineryExterior wood furnishings.
Lot eight: calender locksmithCalender locksmith.
Lot new: interior joineryInterior joinery.