The contractual works include the construction of a new 2 level interchange on E39 at Eikeskogen, and a new culvert for a foot/cycle path below E39 northward. Informative scope:
— Approx. 1 075 metres road adapted for a central reserve.
— Entrance and exit ramps (approx. 1 160 m).
— 2 roundabouts.
— A culvert with 2 traffic lanes and pavements below E39.
— Drainage and surface water pipelines.
o Ca 1 700 metres.
— Water and Sewage pipelines.
o Approx. 300 metres.
— Accompanying preparatory works, cable and conduit works.
— Street light installations.
o Total approx. 71 pylons.
— Preparation of green space/verges.
The project will be carried out on the basis of drawings.