EI&C technology and electrical installation work
Electrical equipment and control of the emergency generator and gas desulfurization.
For the construction of a new emergency generator and gas desulphurisation
EI&C technology
Biofilter
Electrotechnical installation work
Gasentschwefelungsanlage:
This will be attached to the existing technical building gas station and will have space for
a biofilter, a technical room for the plant technology and the switchgear, a storage room
as well as a gas compressor room. All rooms, except for the technical room, are Ex rooms and the
Explosion protection zone II assigned.
Emergency generator (NEA)
For this purpose, a new building will be constructed, which will house the emergency generator,
accommodates the fuel storage as well as the switchgear room.
The electrical connection to the energy supply network of the sewage treatment plant takes place in the
Main voltage distribution "NSHVT-Mechanik 2", switchgear +985 by means of double feed-in. Here-
Two new switchgear panels were installed in the "NSHVT Mechanics 2". Adaptation and supplementary measures are required for the cable connection
on the cable routes of the existing systems.