The municipality of Gomaringen intends to expand and renovate the existing Gomaringen fire station at Robert-Bosch-Strasse 46.
For the extension and renovation of the Gomaringen fire station, a planner is being sought by means of a negotiated procedure with a participation competition for the object planning. The assignment is to take place in stages.
The negotiations are expected to take place on 15.12.2023.
As part of the fire brigade requirements plan, the need to expand the fire station was determined. The aim is to remedy deficits and map future space requirements. These are, above all, the expansion of changing rooms and sanitary facilities with the necessary "black / white" separation (spatial and furnishing separation between operational and social areas), workshops and offices as well as rooms for the youth fire brigade. In this context, in addition to the 5 existing parking spaces, two additional parking spaces for vehicles as well as areas for maintenance and logistics are to be created.
Here, a feasibility study was already carried out in 2023 by the engineering company Laichinger Heimerdinger. This will be made available to the participants in the appendix.
The fire station (built around 1980, reinforced concrete construction), which is mainly still in its original state at the time of construction, is to be renovated both in terms of energy efficiency and with regard to the technical building equipment.
,
The budget is based on total costs of around €5.8 million, gross KG 200-700. In addition to the expansion and renovation of the FW house, this also includes the construction of a cold hall, the outdoor facilities and a PV system including the necessary transformer station.
,
Intended timeline:
Planning to begin in early 2024
Completion in early 2026
The contract period is estimated and starts from the start of planning until completion. The contract term can be extended (depending on the specialist planner) by the warranty (LPH 9).
The renovation measures are to be carried out step by step during ongoing operations.
Usable areas extension approx. 500m², usable areas existing building approx. 900m².
,
The courtyard areas are also to be created.
The costs of KG 500 for the outdoor facilities are estimated at approx. € 340,000 gross. These are paved areas for heavy goods traffic. The expansion and renovation of the fire station will take place during ongoing operations.
,
Funding is applied for for the measures.
,
For the planning and execution of the project, an architect will be responsible for the work phases
1-8, +9 according to § 34 HOAI. The assignment is to take place in stages.
In the first stage, work phases 1-2 are commissioned.
,
There is no legal claim to the further assignment of the subsequent service level, and the contractor also has the right to have individual services provided within a service level itself or by third parties.