- A first phase of demolition of existing buildings and annexes, - A civil engineering part (site installation, structural work and infrastructure) o Excavated material: 6 700.00m³ o Miscellaneous embankments: 3 640.00m² o Cellular glass embankment: 465.00m³ o Concrete: 1 320.00m³ o Waterproof concrete supplement (WU): 575.00m³ o Formwork slabs: 415.00m² o Formwork sails-posts-beams: 4 400.00m² o Masonry: 700.00m² - Part of outdoor facilities o Excavated material: 255.00m³ o Miscellaneous embankments: 1 375.00m² o Pavers surfaces: 525.00m² o Asphalt surfaces: 2 660.00m² o Topsoil surfaces: 2 055.00m² o Underground pipes: 3 795.00ml
- A first phase of demolition of existing buildings and annexes, - A civil engineering part (site installation, structural work and infrastructure) o Excavated material: 6 700.00m³ o Miscellaneous embankments: 3 640.00m² o Cellular glass embankment: 465.00m³ o Concrete: 1 320.00m³ o Waterproof concrete supplement (WU): 575.00m³ o Formwork slabs: 415.00m² o Formwork sails-posts-beams: 4 400.00m² o Masonry: 700.00m² - Part of outdoor facilities o Excavated material: 255.00m³ o Miscellaneous embankments: 1 375.00m² o Pavers surfaces: 525.00m² o Asphalt surfaces: 2 660.00m² o Topsoil surfaces: 2 055.00m² o Underground pipes: 3 795.00ml