A 4, Königshainer Berge tunnel, retrofit technical equipment
Manufacture of walk-in emergency telephone niches 40 pcs.
Closure of cross stops 9 pcs.
Produce a surface coating of the tunnel inner shell 40.700 m2
Deliver and assemble tunnel lights 2,632 pcs.
Video cameras deliver + mount 169 pcs.
Renewal of pressure booster system, 1 pc.
Boundary horn speakers deliver+mount 134 pcs.
supply and lay various cables and wires 232,000 m
telecontrol substations deliver and assemble 51 pcs.
Deliver variable message signs and assemble 110 pcs.
Deliver and assemble line stations 37 pcs.
Deliver + mount traffic sign bridges 6 pcs.