works to create the collective wastewater treatment system (collection and treatment) and to renew the drinking water networks in the municipalities of BERNEUIL and La Jard.
Lot 1 PIPESlot no. 1: pipes - sanitation part: Supply and installation: 7,570 ml of gravity collectors (PVC and Polypropylene) and 185 manholes (HDPE) - 296 special service manholes - 2,550 ml of discharge pipes (HDPE)
Drinking water part: Supply and installation: 3,330 ml of PVC and cast iron distribution pipes - taps and fountain equipment and renewal of 56 private connections.
Use of similar contracts under the conditions provided for in Articles R. 2122-1 to R. 2122-11 of the Public Order Code, up to: 250,000 euro (excluding VAT). (Cf Rc)
Lot 2 - Discharge postsLot 2: Discharge stations - Supply and installation of 6 wastewater discharge stations: civil engineering, hydraulic, electrical and pumping equipment
lot 3 - TREATMENT PLANTconstruction and commissioning of a wastewater treatment plant with a nominal capacity of 1,000 PE (expandable to 1500 PE) of the "biological discs with clarification/drying beds planted with reeds and vegetated discharge zone type infiltration";