On Bachtelstrasse, in the Weinbergstrasse section to after the level crossing, the Haubel canal for mixed water and the stream water canal must be replaced. In cooperation with SBB AG, the present DRAFT construction project must be completed. This is followed by the processing of the approval procedure and the execution project, as well as the realization and commissioning.
On Bachtelstrasse, in the Weinbergstrasse section to after the level crossing, the Haubel canal for mixed water and the stream water canal must be replaced. In cooperation with SBB AG, the present DRAFT construction project must be completed. This is followed by the processing of the approval procedure and the execution project, as well as the realization and commissioning.