The kbo-Isar-Amper-Klinikum gGmbH, Klinikum München-Ost, is renovating an existing building built around 1910 for use as a psychiatric special clinic.
As part of the renovation, tubular frame doors are to be installed and put into operation.
Pipe frame doors steel-glass:
- 4 elements with fire protection requirements T30 - RS,
- 4 elements with fire protection requirement RS,
- 3 elements without fire protection requirements,
- Sheet steel doors with block, corner and surrounding frames:
- 5 doors with fire protection requirements T30 - RS,
- 11 elements with fire protection requirement T30,
- 2 elements with VDS requirement,
- Incl. Creation of all necessary connections of the respective door equipment.
The kbo-Isar-Amper-Klinikum gGmbH, Munich East Clinic in Haar, is renovating an existing building built around 1910 for use as a psychiatric specialty clinic.
Building data:
Gross floor area:
- Basement: approx. 615 m
- Ground floor: approx. 615 m
- 1st floor: approx. 615 m
- DG: approx. 400 m
Floor heights:
- basement: approx. 2.60-2.80 m,
- Ground floor: approx.3.95 m,
- 1st floor: approx.3.95 m,
- DG: approx.2.50 m.
The main subject of this tender is the manufacture, delivery, installation and commissioning of tubular frame doors. The service has the following scope:
Pipe frame doors steel-glass:
11 pieces
- 4 elements with fire protection requirements T30 - RS,
- 4 elements with fire protection requirement RS,
- 3 elements without fire protection requirements.
Sheet steel doors with block, corner and surrounding frames:
18 pcs
- 5 doors with fire protection requirements T30 - RS,
- 11 elements with fire protection requirement T30,
- 2 elements with VDS requirement.
Incl. Creation of all necessary connections of the respective door equipment with:
- Creation of all lines including milling, line laying and sockets as a preliminary measure immediately before placing the order in separate LV positions,
- Manufacture, delivery and installation of tubular frame doors steel-glass or sheet steel,
- Connection of all control elements (SR + SS), all smoke detectors and other components,
- Installation,
- On-site BMA contact via ELT.