project management for the reinforcement and enhancement of the banks of the island of Puteaux Bras non-navigable
the consultation concerns a project management mission for the reinforcement and enhancement of the banks of the island of Puteaux, on the dead arm side, between the Puteaux bridge and Lebaudy Park. The site is about 700 ml long, and concerns the width between the towpath (included) and the foot of the bank.The content of the project management mission includes the following "basic mission" elements: - preliminary design studies (Avp); - project studies (Pro) and realization of the business consultation file (Dce); - assistance in the award of works contracts (Act); - visa of execution studies (Visa); - direction of the execution of works (Det); - scheduling, steering and coordination (Opc) - assistance with reception operations (Aor) and during the period of guarantee of perfect completion (Pa) and guarantee of recovery of plants (Pra). The complexity and scope of the supervisor's mission include details which will be mentioned in Article 5 of the special clauses, a document submitted during the tender phase. These details will complete the content of the elements defined within the order code publique.il other mission elements may also be provided:- project certificate: Mc1- case-by-case examination: Mc2- bring to attention: Mc3- fauna, flora and spawning ground: Mc4- environmental authorization file including authorization under the Water Act (including public inquiry): MC5- additional studies - drafting of specifications: Mc6- 2d hydraulic modelling: Mc7- environmental assessment and integration into the environmental authorization file: Mc8- derogation file "Protected species" and integration into the environmental authorization file: Mc9Duration of the contract The project management contract is concluded for a period ranging from the date of notification of the contract to the completion of the guarantee of perfect completion of the works and that of the plant take-back guarantee (including the completion and comfort period). The start date of the work is scheduled for the first quarter of 2024. The estimated time of the work is estimated at twelve (12) months for the firm tranche. In addition, there is a six (6) week preparatory phase.