A38, AS Heringen-AS Berga, per-km 82.0-91.8, both RF, lot 2 track construction
Asphalt layer 200,000 m2
Frost protection layer 17,000 m2
asphalt binder layer
surface layer of mastic asphalt 40,000 m2
Produce concrete pavement 180,000 m2
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.