Natural gas | Tenderlake

Natural gas

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
11 April 2023
Closing Date:
10 May 2023
Location(s):
PL418 Poznański (PL Poland/POLSKA)
Description:
Comprehensive supply of high-methane natural gas (group E) for the Municipality of Murowana Goślina and entities listed in the SWZ, for the period from 01.07.2023 to 30.06.2025

1. The subject of the contract is a comprehensive supply of high-methane natural gas (group E), i.e. the supply of gaseous fuel together with distribution services to the Ordering Party's facilities, in the period from 01.07.2023 to 30.06.2025, with a maximum fuel demand of 3 696 960 kWh – according to Annex 1 to the SWZ.

1. The subject of the contract is a comprehensive supply of high-methane natural gas (group E), i.e. the supply of gaseous fuel together with distribution services to the Ordering Party's facilities, in the period from 01.07.2023 to 30.06.2025, with a maximum fuel demand of 3 696 960 kWh – according to Annex 1 to the SWZ. 2. Gaseous fuel should be delivered around the clock to the delivery and receiving points listed in Annex 1 to the SWZ, which is a set of gas equipment used to connect the internal network, owned by the Ordering Party with the gas network of the system operator. 3. In the course of the execution of the order, the Ordering Party reserves the right to reduce or increase the size of the order in the range of +/- 10% in relation to the basic amount of gas fuel for the purchase of gas. The increase in the size of the contract will take place on the basis of the right of option. The rules, scope and manner of using the above by the Ordering Party are described in Appendix 2 to the SWZ – Draft provisions of the contract in § 1 clauses 3 and 4. 4. If the Ordering Party is/are an entity entitled to settlements according to tariff prices approved by the President of ERO within the meaning of the Act of 26 January 2022 on special solutions for the protection of gaseous fuel consumers in connection with the situation on the gas market, the following proceedings have been accompanied by STATEMENTS OF THE RECIPIENT OF GASEOUS FUELS signed by the Contracting Authority on the purpose of the gaseous fuel, according to the template attached to the Regulation of the Minister of Climate and Environment of 28 January 2022. A given PPG may be partially or fully settled according to the prices from the Sales Tariff approved by the President of ERO – information is included in Annex 1 to the SWZ – description of the subject of the contract. The settlement of the gas distribution and purchase service will take place on the terms set out in the Act of 10 April 1997. Energy Law, Act of 26 January 2022 on special solutions for the protection of gas fuel customers in connection with the situation on the gas market, Act of 15 December 2022 on special protection of certain customers of gaseous fuels in 2023 in connection with the situation on the gas market, distribution tariff and sales approved by the President of ERO. 5. Information on the subject of the contract and the obligations of the Contracting Authority and the Contractor are included in Appendix 2 to the SWZ – Draft provisions of the contract. 6. At the request of the selected Contractor, the Contracting Authority shall provide the necessary data to carry out the procedure of changing the seller in an electronic Excel version immediately after signing the contract. 7. Information on the currently binding agreements is described in Annex 1 to the SWZ in the column "Duration of the current contract / notice period". 8. Number of contracts for the comprehensive supply of gaseous fuel to be concluded by the Contracting Authority with the contractor selected in these proceedings: 7 contracts.

Download full details as .pdf
The Buyer:
GMINA MUROWANA GOŚLINA
CPV Code(s):
09123000 - Natural gas