This is an alloti consultation in 9 lots.
This operation includes the construction of 54 intermediate housing units and 17 social housing units.
the site visit is mandatory for some lots as set out in section 3.1.4 of the CR
Earthworks, Depollution, Structural Work, Screeds, Sealing and Exterior Joinerycf.cctp
Facade cladding and scaffoldingcf.cctp
Locksmith, Metalwork and Parking Doorcf.cctp
Lining, Partitions, False Ceilings, Interior Joinery, Hard Floors, Flexible Floors and Paintingcf.cctp
liftscf.cctp
Electricity strong and weak currentscf.cctp
Plumbing, heating, ventilation and air conditioningcf.cctp
Roads and Miscellaneous Networks and Evcf.cctp
Shared terracecf.cctp