Specialist planning service ELT according to § 55 HOAI, LPH 1-9
PROJECT: Planning of a 3-fold sports hall with outdoor sports facilities in the northern part of the city of Nuremberg
Project scope: On behalf of the City of Nuremberg, WBG KOMMUNAL GmbH is supervising a new construction of a 3-fold sports hall, with grandstand and associated operating, storage and technical rooms in the northern urban area of Nuremberg.
The measures also include the construction of a natural grass pitch approx. 90x60m and an artificial turf pitch approx. 90x60m, as well as the construction of a jumping pit with inrun lanes. The measures were to be carried out in 3 construction phases.
Schedule:
Design planning 1.Q.2024
BA 1_Herstellung Kunstrasensportplatz 1.Q.2025 - 3.Q.2025
BA 2_Herstellung Naturrasensportplatz 3.Q.2025 - 1.Q.2026
BA 3_Errichtung Sports Hall 4.Q.2025 - 4.Q.2027
Budget:
The client has costs for the aforementioned measure in the amount of approx. 12.4 million euros "net" KG 200-700 and approx. 9.3 million EUR net KG 3
00-400. Assuming a distribution between KG 300 and 400 from 70% to 30%
In determining the HOAIFachplaner's fee ELT, approx. 960,000 EUR net chargeable costs.
Scope:
The tendered services of the technical planning ELT for buildings according to §55 HOAI are commissioned in stages. At a minimum, level 1 services are awarded. The commissioning of further service phases takes place in the event of their
Assignment in whole or in part, in the following stages:
Stage 1: HOAI performance phase 1 - 2
Stage 2: HOAI performance phase 3 - 4
Stage 3: HOAI performance phase 5 - 7
Stage 4: HOAI performance phase 8 - 9
The contractor is not entitled to the commissioning of further services or levels 2 to 4 [in whole or in part]. No additional claims for fees or damages can be asserted from the step-by-step commissioning
can be made.