New construction of the municipal indoor swimming pool in Nördlingen:
Bruttogrundfläche: 6.000 m²
Gross floor area: 3,700 m²
Bruttorauminhalt: 35.000 m²
Dimensions:
Indoor swimming pool: 75 m x 26 m
Changing rooms: 65 m x 11.30 m
Sauna: 52 m x 16.25 m
Außensauna: 18 m x 7 m
Construction of sanitary facilities
-17 WC´s
-13 washbasins
-7 urinals
-5 Ausgußbecken
-45 shower systems with central control
-Equipment sauna cold treatment
-Water heating as a 4-cascade in the flow principle
-Grauwasserhebeanalge
-Approx. 1,000 m PP sewage pipe
-Approx. 350 m steel drainage pipe (rainwater)
-31 roof drains gravity mirror + vacuum
-Approx. 2,100 m stainless steel drinking water pipe
-1 Enthärtungsanlage
-1 pressure booster
-1 high-pressure cleaning system