The existing elementary and regular school is to be brought together on a “campus”. For this reason, a part of the building will be added to the existing regular school. The primary and regular school rooms including administration, canteen, auditorium and other central functions are to be accommodated in this.
Lot 10 - locksmith work
Overview of services
- approx. 95 m² sheet steel plates as stair railing d= 10mm, following the staircase
- approx. 100 m handrails stainless steel dm= 42.4mm, wall-mounted
- 15 brackets for sheet steel railings on elevator shafts, steel, 2 pieces
- 4 flat steel railings for floor-to-ceiling windows incl. brackets
- 1 piece façade net, approx. 14 m², black stainless steel, incl. fastening
- approx. 50 round tube supports for ventilation, different sizes
- 2 pieces of steel frame made of HEA 120 for ventilation units
- 3 parapet risers S235JR, hot-dip galvanized
- approx. 55 m profile steel bracket 150x75x9mm, in individual lengths