Conversion of the building in 2001 in the old barracks into an 11-group daycare center
In order to prepare the building for the use of a KiTa, extensive demolition measures and a large number of new construction measures are necessary.
This is the lot 23 - thermal insulation and fire protection
- 2500 m thermal insulation mineral wool pipe shell DN 12 - DN 100
- 150 m thermal insulation elastomer foam pipe DN 15 - DN 40
- 750 m cold insulation mineral wool pipe shell DN 15 - DN 65
- 360 m² thermal insulation on air ducts, elastomer foam
- 1050 m² thermal insulation on air ducts, mineral wool laminated with aluminium
- 450 fire bulkhead non-combustible piping DN 12 - DN 100
- 155 fire bulkhead combustible piping DN 50 - DN 110
- 230 fire bulkheads on electrical lines
- 280 m annular gap closure with mortar or concrete
- 1 fire protection documentation
- 180 annular gap closure with fire protection compound