The purpose of this contract is to comply with the BREF incineration and to carry out various works to adapt the treatment of the existing fumes of the Mirail energy recovery unit (UVE) in Toulouse. This unit has an administrative capacity of 330,000 t/year, and includes 3 lines of 10 t/h and a line of 14 t/h
the contract includes one firm tranche and eight (8) optional tranches. The firm phase concerns the design, construction and commissioning for compliance with the BREF incineration and various renovation works of the existing smoke treatment of the EV.The optional instalments concern in particular the realization of all the services necessary (studies, execution of works, commissioning) for the renovation of the towers of wet flue gas washing