The purpose of the contract is to carry out environmental collection to update the existing environmental database around GRDF's MPC networks in more than 50 departments.
The collection includes LES, buildings, communication routes, and vegetation areas.
The contract covers a total linear of 1,800 km of MPC high-pressure network.
The 2 main services are as follows:
- collection of the existing,
- collection of the flow.
The 2 main services are as follows:
- collection of the existing,
- collection of the flow.
The 2 main services are as follows:
- collection of the existing,
- collection of the flow.