New construction of an 8-group daycare center as a replacement building for the Blandine-Merten-Haus daycare center, which was destroyed in the Ahr flood in 2021.
- 2-storey building in solid construction with ETICS, partly wooden façade
- Building plot approx. 4,465 m².
- Net room area of around 1,925 m².
- Daycare places Space for 25 U3 children and 150 U3 children.
- Flood-adapted construction method in the flood plain
- District heating and PV
- Central ventilation system
LOT 2 Special civil engineering, earthworks, drainage and structural work
- 635 m³ excavated earth
- 1375 m of soil displacement piles
- 425m Grundleitungen
- 1165 m² Perimeterdämmung
- 300 m³ waterproof floor slab
- 162 m³ reinforced concrete walls, columns
- 312 m² Non-load-bearing masonry, d = 11.5 cm
- 1460 m² load-bearing masonry, d = 24 cm
- 710 m³ concrete ceiling, formed, d = 25 cm
- 78 t Stabstahl
- 85 t Mattenstahl