New construction of the Schwäbisch Hall correctional facility
Electrical installation
2.1.200 Dry transformer 630 KVA 2 pcs.
2.2.10 Emergency generator 650 KVA
2.5 Low-voltage main distribution consisting of:
Eingangsfeldern 2St
Kuppelfeld 2St.
Abgangsfelder 6 St.
Leistungschalter 2000 A 3 St
2.7 Hauptkabel
NYY-J 5x16 mm2 1500 m
NYCWY 4x25 mm2 470 m
2.9 Installationsleitungen
3x1,5 mm2 19.000 m
3x2,5 mm2 21.000 m
5x2,5 mm2 17.500 m
2.13 Technikleuchten 223
Office luminaires 426 pcs.
Flurleuchten