The orthopaedic building complex built at the beginning of the 30s in Semmelweis-/Philipp-Rosenthal-Straße, which has already been renovated and converted several times, for the last time as a psychiatry, is again in need of renovation. A core task is the complete replacement of the ailing drinking water system, including connection to the public utilities, as well as the upgrading of the low-voltage grid, especially in the telecommunications sector. In addition, there are mandatory interventions in the main building distribution to ensure operation.
315 m multi-conductor cable up to 4x240 qmm, partly with FE;
4,775 m single-conductor cable up to 1x240 qmm, partly with FE;
395 m cable support system up to 500 mm wide, partly with FE;
80 sqm fire protection cladding F30;
2,160 m cable 4x35/16 to 4x120/70 partly with FE;
1 hour Main building distribution AV, consisting of 9 panels, of which 5 panels with circuit breaker, 3 panels with safety edges, 1 corner panel;
1 hour Main building distribution SV consisting of 4 fields, of which 2 fields with circuit breakers, 2 fields with safety edges;
1 hour Automatic switching device;
2 St. Wartungsumschaltverteiler;
1 hour DC UPS system for 110V control voltage;
Accessories control rooms;
Dismantling and disposal of GHV stock.