A 94 Munich - Pocking (A 3), section Malching-Kirchham earthwork and ceiling construction.
- A 94 Munich - Pocking (A 3), section Malching-Kirchham earthwork and ceiling construction;
- 4,385 t of excavation and transport of material containing tar and pitch;
- 347,000 m
- 351,000 m
- 193,000 m
- 80 770 m
- 110 140 m
- 133 600 m
- 1 380 m temporary Longitudinal marking, yellow, type II, KSP;
- 220 m temporary Longitudinal marking, yellow, type II, foil;
- 4,160 m longitudinal marking, white, type II;
- 580 m of HD-PE conduit;
- 28 230 m PE-HD cable protection pipes;
- 692 m of cable duct in the foundation;
- 57 cable ducts;
- 240 m
- 2 232 m protective devices.