Earthwork and structural work
At the Lindenberg bus depot, 3 BusPort systems for approx. 160 BSVG buses are to be built using the cut-and-cover method with subdividing fire walls.
For logistical reasons, the construction of the BusPort facilities will take place one after the other, in 3 construction phases.
Size BusPort 1 = approx. 44.0m x 86.0m, size BusPort 2 = approx. 44.0m x 126.0m, size BusPort 3 = approx. 37.0m x 86.0m.
The subject of this tender is the earthworks and shell construction work consisting of preparation of the areas, earthworks and structural work for the BusPorts best. from
Quiver foundations with precast reinforced concrete columns and precast reinforced concrete fire walls.
The installation areas for the buses in the parking facilities are to be created as concrete surfaces and as a semi-rigid surface course with the corresponding substructure layers.