Provision of scaffolding work as part of the renovation of the vocational school in Wörth am Rhein
The trade "scaffolding work" includes the following work:
- Preparation of a statics
- 1,030 sqm façade scaffolding as metal scaffolding, LK3, W06
- 520 sqm façade scaffolding between columns and covers, LK3, W06
- 170 m scaffolding brackets on the inside of the scaffolding aisles
- 340 m internal side protection
- 200 m Dachdeckerfangschutzgerüst
- 1 stair climb as an allowance
- 1 protected passage for people
- 1,030 m² dust net
- 470 m protective film on the ground under the scaffolding