The new construction of the FTZ and the LZ-G includes the creation of vehicle hangars, workshops, an office wing and social areas with changing rooms and toilets and showers.
The order includes the electrical installation of the high and low voltage systems for the entire building with the laying system, cables and lines, installation devices.