Construction of an indoor pool:
BRI: 13,600 m3; GFA: 2,725 m
Pool: 12.50 mx 25 mx 1.80 m
Sewer works
The following are the rough advertised masses:
- construction site equipment and security;
- manhole and bottom level determinations, pressure tests;
- remove / dispose of 265 m underground pipes up to DN 200;
- 1 120 m
- 330 m underground pipes made of PP up to DN 250;
- 13 service chutes up to 3.5 m deep D = 1.0 m with cover;
- Various manhole bases, manhole rings and manhole necks;
- 12 manhole covers up to class D 400;
- 20 m gutter sections DN 100 with slotted grate made of cast iron;
- 12 m trenches DN 400, 4 associated shafts;
- 1 grease separator for underground installation, volume approx. 720 ltr., Including sampling shaft;
- 30 m cable protection pipe system NG 110.
Sewer works
The following are the rough advertised masses:
- construction site equipment and security;
- manhole and bottom level determinations, pressure tests;
- remove / dispose of 265 m underground pipes up to DN 200;
- 1,120 m3 of various earthworks to a depth of 4.0 m;
- 330 m underground pipes made of PP up to DN 250;
- 13 service chutes up to 3.5 m deep D = 1.0 m with cover;
- Various manhole bases, manhole rings and manhole necks;
- 12 manhole covers up to class D 400;
- 20 m gutter sections DN 100 with slotted grate made of cast iron;
- 12 m trenches DN 400, 4 associated shafts;
- 1 grease separator for underground installation, volume approx. 720 ltr., Including sampling shaft;
- 30 m cable protection pipe system NG 110.