Construction work for water projects | Tenderlake

Construction work for water projects

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
07 June 2021
Closing Date:
05 July 2021
Location(s):
PL712 Łódzki (PL Poland/POLSKA)
Description:
Restoration of reservoirs and construction of new water equipment in the area of Forest Area Column

The object of the order is construction works consisting in the restoration of reservoirs and the construction of new water equipment in the area of the Forest Forest District of Rydzyna and Szczukwin. The Ordering Party divided the item of the order into 6 parts.

Construction work in the field of water engineering in Rydzyny_1

Execution of construction works covering its scope:

— manufacture of water equipment — restoration of reservoirs:

Restoration of retention reservoir No 1,

Restoration of retention reservoir No 2,

Restoration of retention reservoir No 3,

— construction of water equipment — reconstruction of the R-2 ditch, which consists of demolition of existing culverts and execution of new ones:

Demolition of the existing and construction of the new P-1culvert,

Demolition of the existing and construction of the new P-2culvert,

Demolition of the existing and construction of the new P-3 culvert.

Minimum warranty period for works made: 48 months.

The subject of the order is described in detail in the design documentation and Technical Specification of the performance and reception of construction works. The terms of execution of the order are specified in the draft contract.

Construction work in the field of water engineering in the Rydzyny_2 forestry

Construction work in the field of water engineering in the Rydzyny_2 forestry

Execution of construction works covering its scope:

— manufacture of water equipment — restoration of reservoirs:

Restoration of retention reservoir No. 4.

Minimum warranty period for works made: 48 months.

The subject of the order is described in detail in the design documentation and Technical Specification of the performance and reception of construction works. The terms of execution of the order are specified in the draft contract.

Construction work in the field of water engineering in the territory of the Szczukwin_1

Construction work in the field of water engineering in the territory of the Szczukwin_1

Execution of construction works covering its scope:

— manufacture of water equipment — construction of water reservoirs:

Construction of retention reservoir No 1,

Restoration of retention reservoir No 2,

Construction of culvert B-1A between reservoirs 1 and 2 (on a newly designed supply unit between tanks 1 and 2),

— manufacture of water equipment - reconstruction of trenches consisting of:

Trench MW-9 - Construction of culvert B-1,

Trench MW-9 - Demolition of existing and construction of new B-2culvert,

Ditch MW-9-6-2/MW-9-6-1 - Demolition of existing and construction of new B-3culvert,

Trench MW-9 - Demolition of existing and construction of new culvert B-4,

Ditch MW-9 - Construction of a B-4a wooden valve.

Minimum warranty period for works made: 48 months.

The subject of the order is described in detail in the design documentation and Technical Specification of the performance and reception of construction works. The terms of execution of the order are specified in the draft contract.

Construction works in the field of water engineering in the territory of the Szczukwin_2

Execution of construction works covering its scope:

— manufacture of water equipment — construction of water reservoirs:

Expansion and reconstruction of retention reservoir No 4,

— manufacture of water equipment — reconstruction of ditches consisting of:

Ditch R — Demolition of existing and construction of new B-14 culvert.

Minimum warranty period for works made: 48 months.

The subject of the order is described in detail in the design documentation and Technical Specification of the performance and reception of construction works. The terms of execution of the order are specified in the draft contract.

Construction works in the field of water engineering in the territory of the Szczukvin_3

Execution of construction works covering its scope:

— manufacture of water equipment — construction of water reservoirs:

Construction of retention reservoir No 3,

— making water equipment — robots in the waters of the Little View, involving the demolition of old ones and the construction of new culverts:

Demolition of existing and construction of new B-5culvert,

Demolition of the existing and construction of the new B-7culvert,

Construction of the new B-8culvert,

Demolition of the existing and construction of the new B-9culvert,

— manufacture of water equipment — reconstruction of ditches consisting of:

Trench MW-7 — Demolition of existing and construction of new culvert B-8.1,

Trench MW-5 — Demolition of existing and construction of new culvert B-6,

Trench MW-7 — Demolition of existing and construction of new culvert B-10,

Trench MW-7 — Demolition of existing and construction of new culvert B-13,

Trench MW-4-1-1-1 — Demolition of existing and construction of new culvert B-11,

Trench MW-7-5-5 — Demolition of existing and construction of new culvert B-12,

Trench R-7 — Construction of the B13a wooden valve.

Minimum warranty period for works made: 48 months.

The subject of the order is described in detail in the design documentation and Technical Specification of the performance and reception of construction works. The terms of execution of the order are specified in the draft contract.

Construction works in the field of water engineering in the territory of the Szczukvin_4

Execution of construction works covering its scope:

— manufacture of water equipment — construction of water reservoirs:

Expansion and reconstruction of retention reservoir No 8,

— manufacture of water equipment — reconstruction of ditches consisting of:

Trench R — Demolition of existing and construction of new culvert B-15,

Trench R-2 — Demolition of existing and construction of new B-16culvert,

Trench R-2 — Demolition of existing and construction of new culvert B-17,

Trench R-2 — Construction of the B-17a wooden valve,

Trench R-2 — Construction of drainage well B-18,

Trench R-1-1 — Construction of the B-19 wooden valve.

Minimum warranty period for works made: 48 months.

The subject of the order is described in detail in the design documentation and Technical Specification of the performance and reception of construction works. The terms of execution of the order are specified in the draft contract.

Download full details as .pdf
The Buyer:
Lasy Państwowe Nadleśnictwo Kolumna
CPV Code(s):
45240000 - Construction work for water projects