Locksmith work for the new construction of the company and machine building.
The following locksmith work must be carried out for the operating and machine buildings (5 buildings):
- approx. 70 m banister, galvanized with stainless steel handrail,
- approx. 80 m railing, three-part, galvanized,
- approx. 135 m platform and stair end plates made of stainless steel,
- approx. 16 glass canopies in the door area,
- approx. 600 kg hot-dip galvanized steel, for supporting structures and end brackets,
- approx. 200 kg stainless steel for supporting structures and end brackets etc.,
- approx. 100 m edge protection bracket made of stainless steel,
- approx. 4 pieces of grating stairs with approx. 6 to 8 gradients,
- approx. 2 grating stairs with approx. 16 to 20 gradients.