Refurbishment of the Franziskus Elementary and Secondary School Plus Irrel, connection of the new transformer system
Lot 138 Connection of transformer, NSP school cable - retraction of approx. 230 m main supply cable in aluminium, 4 x 300/150 mm² for schools and swimming pools in empty conduits
- Construction of 2 distribution manifolds as transfer distributors to supply the school and the swimming pool with introduction, removal and placement, as well as 1 feed-in housing for flanging to the school's existing NSHV with enclosing
- Dismantling of approx. 100 m cable with different wire cross-sections from 4 x 70 mm² to 5 x 120 mm²
- Extension of cable routes at school and in the swimming pool of approx. 40 m