The Christiph-von-Schmid Realschule Thannhausen is to be completely renovated in the coming years.
For this purpose, the “roundel building” and part of the main building are first demolished. The extension of the secondary school will then be built here, a new break hall will be created and the school's accessibility will be established.
The execution of the overall project is planned in 2 construction phases.
Insulation and fire protection work on technical installations heating, plumbing, ventilation. divided into 2 construction phases
- BA I: Extension
- BA IA conversion of heating system in old building
BA I Extension:
Scope of wastewater:
synthetic rubber as condensation insulation as well as structure-borne sound insulation on pipelines Dirty water from cast iron DN 50-125 – 100 m,
Scope of water system:
synthetic rubber pipelines steel stainless steel 18-42 mm – 700 m, fittings 18-42 mm -
1,200 pcs, flow divider (venturi system) DN 20-32 – 2 pcs, shut-off valves DN 15-40 – 30 pcs, water connection DN 40 with filter, pressure reducer and non-return valve,
Mineral wool insulation for hot water pipes connection gym 18-35mm 40m
Scope of heating:
Mineral wool insulation, heating cables welded carbon steel DN 15 -125 – 1,300 m, fittings and fittings: 560 pcs, fittings, gate valves and dampers DN 15-125 – 50 pcs, buffer tank 2,000 l, control valves,
Scope of cold:
Synthetic rubber for refrigeration lines carbon steel welded and primed DN 15-100 – 310 m, fittings DN 15-100 – 300 pcs, pipe suspension by means of cold clamps, fittings DN 15-100 – 70 pcs (butterfly valves and ball valves) Buffer tank 2,000 l
Supply floors cold / heating:
Synthetic rubber for distribution pipelines floors: pipelines made of PP DN 15-65 – 2,000 m, fittings DN 15-65 – 1,200 pcs, shut-off valves DN 15-65 – 340 pcs,
Scope of ventilation:
Condensation insulation on FO and AU pipes 2,500 - 3,000 mm 70m2, fire protection cladding made of silicate boards 2-, 3- and 4-sided up to 800mm 160m2