The Bad Kreuznach wastewater disposal facility (client AG or ABW for short) intends to convert the Ebernburg sewage treatment plant (with approx. 9500 EW) into a wastewater pumping station with a new construction of a pressure pipe (approx. 1380m) for connection to the ABW sewer network.
The needs assessment is complete. For details of the action, refer to the SOW, which is available for download.
The planning services required for the measure are to be awarded in 3 lots; lot 1 object planning services for the engineering structures and the planning services of mechanical equipment, lot 2 planning services for technical equipment electrical and electronic MSR technology and lot 3 services of structural engineering.
The subject of this announcement is lot 1 - object planning services for engineering structures and mechanical equipment.
The subject of this announcement is lot 1 - object planning services for engineering structures and mechanical equipment. In the sense of HOAI, the scope of processing includes: § 43 engineer buildings, in the service phases § 1-8 HOAI (including LP 7 in part), as well as local construction supervision and § 55 Technical equipment of machine technology with the service phases § 1-8 HOAI (of which LP 7 partly).
The anticipated eligible costs are
Civil engineering structures:
Engineering structure (pumping station) 495.170 EUR
Pressure piping 495.170 EUR
RÜB conversion 220,000 EUR
technical equipment pumping station
KG 410 80,000 EUR (pipe engineering, valves)
KG 470 70,000 EUR (pumps)
The approval planning is to be created by the end of May 2022. A structural realization of the measure is planned in 2023.