In an existing building, 2 floors, the following technical installations are planned:
Creation of the design plan for 3 toilet units, a tea kitchen, a heating system, ventilation system, basic lighting, conversion and extension of the power supply, EMA, BMA, data network, elevator, house connections.
Planned eligible costs / level of difficulty on average for performance picture TGA:
- Asset group 1 124 440 EUR Honorarone I,
- Group of assets 1 285 000 EUR Honorarone II,
- Anlagegruppe 1 367 670 EUR Honorarone II,
- Anlagegruppe 1 4203 920 EUR Honorarone II,
- Investment Group 1 569 130 EUR Honorar Zone II,
- Group of assets 1 650 000 EUR Honorary zone II.
The awarding takes place in accordance with VgV 2016 via a negotiated procedure with the participation contest. The candidate, who, based on his offer, expects the best possible solution of the task, receives the order. The service level 1 (LPH 2-4) must first be provided by the planner to be assigned. Completion of performance level 1 is expected within approx. 3 months after placing the order. The capacities required to meet the target dates must be available. The RLBau MV must be observed.