Restoration of the destroyed infrastructure in Poststraße and Ahrstraße, renewal of the RW and SW sewers with house connections, renewal of the water pipe with house connections, renewal of the road, installation of rainwater storage systems with irrigation function, 1.BA until 2024, 2nd BA in 2025
7,500 m3 trench excavation, sewer construction incl. HA
Laying 380 m sewer DN 250 Stz
Laying 230 m sewer DN 300 Stz
Laying 170 m of DN 300 SB duct
Laying a 100 m DN 400 SB duct
Laying 140 m DN 500 SB duct
Laying 90 m of sewer DN 600 SB
Laying 800 m sewer HA DN 150 Stz
1,000 m3 trench excavation lines incl. HA
300 m WL DN 250 GJS verlegen
Laying 300 m WL-HA DA 32-50 PE
Laying 300 m WL-HA DA 32-50 PE
200 m FW DN/DA 65/180-80/200
1,500 m3 excavation of road construction
Installing 1,000 m3 of ballast base course
Laying 1,900 m of 3-line natural stone strip
Laying 2,900 m2 of paving area (high standard)
7 Making rainwater storage tanks with irrigation function
Prepare 26 new tree locations
Setting up 35 street lights